Datacentre Power Budget

Given available megawatts, calculate max GPU capacity. Power is the binding constraint for AI scale. PUE, cooling, and GPU TDP included.

Total facility power at grid connection (MW)
Total power รท IT power. 1.2=efficient, 2.0=average
Liquid/immersion reduce effective PUE in the calc
GPU TDP for capacity; used for cost estimate
Reserve % held back for spikes; reduces usable capacity

Calculation

MetricValue
Max GPU Count-
Est. Monthly Cost-
IT Load (MW)-
Power per GPU (W)-
Cooling Overhead-
Reserve Headroom-

Contact Us

Questions or feedback? Get in touch via our contact form.

Contact

FAQ

Visit our FAQ Center for more information and commonly asked questions.

FAQ